But there is still one major problem: the amount of the property loss has not been resolved.
For an Ontario property owner dealing with a significant fire, water or catastrophic loss, this can become a critical point in the claim. Reconstruction cannot remain on hold forever, yet moving ahead while major differences remain between the documented repair scope and the amount being valued can make an already complicated loss even harder to manage.
At this stage, getting another contractor quote may not solve the underlying problem. The more important questions are whether everyone is valuing the same scope of work, whether the disagreement is actually about the amount of loss, and whether an insurance appraisal process may be applicable under the policy.
An Estimate and an Insurance Appraisal Are Not the Same Thing
A detailed restoration or reconstruction estimate establishes the anticipated cost of a defined scope of work. Insurance appraisal is different. Where applicable under the policy, appraisal may provide a process for addressing a disagreement concerning the amount of loss.
Before getting to that stage, however, the physical loss needs to be understood. You cannot properly value a project if there is still uncertainty about what actually needs to be repaired or replaced.
That is where a detailed Property Loss Assessment can become important. The assessment should connect the observed property conditions with the repair requirements rather than beginning with a desired dollar amount.
For a substantial fire, flood or other complex event, that foundation becomes even more important because the loss may involve multiple rooms, building systems, trades and stages of reconstruction.
Before Comparing Dollars, Determine Whether Everyone Is Pricing the Same Project
Suppose one estimate values a major property loss at $325,000 while another position approaches $500,000.
The immediate reaction may be that somebody's price is wrong.
But a $175,000 difference does not necessarily come from labour rates or material pricing. The two estimates may describe substantially different projects.
One scope may assume that an assembly can be repaired while another calls for replacement. Demolition quantities may differ. Electrical work may be missing. Finish specifications may not match. One estimate may include work in adjoining areas that another excludes. Access requirements or reconstruction sequences may also be treated differently.
Before the bottom-line figures can be meaningfully compared, the underlying scope needs to be understood.
Vibo's Scope, Specifications & Bid Support services can help examine the proposed work and identify where significant differences exist. On a major loss, understanding why two numbers are different can be considerably more valuable than simply obtaining a third number.
A Detailed Xactimate Estimate Should Explain the Number
On a large property loss, an estimate should do more than produce a total at the bottom of the page.
It should help explain how that total was developed.
Rooms, dimensions, quantities, demolition, materials, labour operations and reconstruction activities should correspond with the actual repair requirements of the property.
Vibo provides Xactimate Estimating Services for restoration and reconstruction losses where detailed estimating is required.
Xactimate does not independently decide what was damaged or what needs to be replaced. The estimate is only as meaningful as the scope, measurements, quantities and repair assumptions entered into it.
That distinction becomes particularly important when a property owner is facing a six-figure disagreement. If the scope is incomplete, changing prices alone will not correct the underlying problem.
What Happens When the Scope Is Developed but the Amount Is Still Disputed?
This is the point where the situation becomes fundamentally different from an ordinary estimating disagreement.
The property has been inspected. The damage has been documented. Demolition may have exposed concealed conditions. The required repairs are becoming clear. Detailed estimates have been developed.
Yet a substantial disagreement concerning the amount of loss remains.
Depending on the insurance policy and circumstances, that may be a point where the policy's appraisal provisions warrant consideration.
Vibo's Insurance Appraisal services focus on the technical valuation of property damage where an appraisal process is applicable.
Insurance appraisal should not be confused with determining whether damage is covered under an insurance policy or providing legal advice concerning policy interpretation. Those are separate issues. The technical focus is on establishing and supporting the amount of loss based on the property damage and repair requirements.
A Strong Insurance Appraisal Starts With the Building
A defensible property-loss valuation should not begin with a target number.
It should begin with the property.
The damaged areas need to be understood. The demolition requirements need to correspond with actual conditions. Repair-versus-replacement assumptions should make sense. Measurements and quantities should be supportable. Electrical and other building-system work should be incorporated where required. The reconstruction scope should reflect what it will actually take to restore the affected property.
That is why Site Inspection & Documentation can become so important before an amount-of-loss disagreement reaches its later stages.
Photographs, measurements, site observations and documentation of concealed conditions discovered during demolition can help maintain the connection between the damaged property and the eventual valuation.
Once reconstruction advances, many of those original conditions disappear. Walls are closed, ceilings are replaced, electrical components are repaired and damaged finishes are removed. Proper documentation helps preserve what existed before those changes occurred.
The Contractor's Estimate Is Important, but It May Not Be the Entire Loss File
A contractor may have an excellent understanding of the work required to rebuild the property, but a complicated loss can generate far more information than a single quotation.
There may be initial estimates, revised estimates, photographs, measurements, demolition findings, electrical reports, consultant information, invoices, change orders and newly discovered conditions. Different professionals may also be looking at different portions of the same project.
Those documents should ultimately tell a consistent story about the property.
Vibo's Property Loss Advisory & Liaison services can help coordinate the technical information surrounding a complex property loss so that assessment, estimating and repair information are not treated as unrelated pieces of the file.
When the loss involves multiple professional stakeholders, Vibo's Professional Partner Services can also support professionals working on substantial property-loss matters.
Major and Catastrophic Losses Make Small Scope Differences Very Expensive
The importance of scope becomes even greater as the size of the loss increases.
On a small repair, a quantity discrepancy may have a relatively limited financial effect. On a major commercial, multi-residential or catastrophic loss, the same type of discrepancy repeated across thousands of square feet can materially affect the overall valuation.
A different assumption regarding ceilings, flooring, demolition, electrical work or an entire building assembly can potentially represent tens or hundreds of thousands of dollars.
That is why Vibo's Catastrophic Loss services focus on larger, more complex property losses where assessment, documentation, estimating and reconstruction information need to remain connected as the project develops.
The larger the loss becomes, the less useful it is to argue only about the final number without understanding what produced it.
Do Not Wait Until the Building Is Rebuilt to Understand the Disagreement
There is another reason to address major valuation differences before reconstruction progresses too far.
The evidence is changing.
Damaged drywall disappears. Burned framing may be removed. Wet insulation is discarded. Electrical components are replaced. Flooring comes out. Ceilings are reconstructed.
Eventually, the damaged building begins to look like a finished building again.
That is exactly what the owner wants, but it also means the original physical conditions become increasingly difficult to observe.
If a substantial amount-of-loss disagreement already exists, allowing the project to advance without adequately documenting those conditions can make the technical file more difficult to understand later.
For this reason, assessment, documentation and estimating should develop alongside the restoration rather than being reconstructed months afterward.
When Another Estimate Is Not Going to Solve the Problem
There comes a point where ordering another estimate simply produces another number.
If the contractor's estimate is $475,000, another estimate is $330,000 and another position is $290,000, the owner does not necessarily need a fourth total.
The owner needs to understand why the numbers are different.
That requires looking behind the totals at the scope, quantities, specifications, assumptions and repair methodology.
Once those differences have been identified and the physical repair requirements are sufficiently developed, the parties have something meaningful to evaluate.
If a material amount-of-loss disagreement still remains, the question of whether insurance appraisal is applicable becomes much more relevant.
Property Loss Estimate Still Disputed Before Reconstruction?
If your contractor is ready to rebuild but a substantial disagreement remains over the amount of your fire, water or catastrophic property loss, Vibo can help examine the technical side of the file.
Vibo Group provides Property Loss Assessment, Xactimate Estimating Services, Insurance Appraisal, site documentation, scope review and major-loss support throughout Toronto, Vaughan and the GTA.
The objective is not to manufacture a larger estimate. It is to establish a repair scope and valuation that can be connected back to the actual damaged property.
When a six-figure loss is approaching reconstruction, that distinction matters.
Contractor ready to rebuild but the amount of loss is still disputed? Call Vibo at 647-330-0532.